Cangzhou Weiheng Pipe Industry Co.,Ltd

Alloy Butt Weld Pipe Fitting Elbows,ASTM Standard DN200 Alloy Butt Weld Pipe Fitting Elbows,90Deg LR DN200 Alloy Butt Weld Pipe Fitting Elbows

86-317-6192299

Home > Products > Pipe Fittings > Elbow Fittings > Alloy Butt weld pipe fitting elbows A234 WP11

Alloy Butt weld pipe fitting elbows A234 WP11

Basic Info

Model No.1/2inch-24inch

BrandWH

Additional Info

Packagingwooden case

Productivity100000TONS

TransportationOcean,Land,Air

Place of OriginCANGZHOU

Supply Ability100000TONS

CertificateISO9001

Payment TypeT/T,L/C,D/A,D/P,Western Union

IncotermFOB

Product Description

carbon steel sch40 pipe elbow 90deg dimensions
A.elbow,tee,reducer.
B.ISO9001:2008
C.ANSI,ASME,DIN,JIS,BS
D.carbon/ss steel

Product

DN200 Seamless Elbow A234 WPB

Size range

1/2"-24" are made by seamless pipes, above up to 72" are made by welded pipes

Thickness

SCH20 SCH40 STD SCH60 SCHXS SCH80 SCH160 SCHXXS etc are available

Angle&Radius

45 degree,r=1.5d (long radius),r=d(short radius)

Standards

ASTMA234,ASTM A420,ANSI B16.9/B16.28/B16.25,ASME B16.9,
JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615,
GB 12459-99,EN Standard etc.

Materials


Stainless steel(ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10,00Cr17Ni14Mo2, ect)


Carbon steel(ASTM A234WPB,,A234WPC,A420WPL6. 20#,Q235,10#,20#,A3, Q235A, 20G,16Mn, ect)


Alloy steel(ASTM A234 WP12,WP11,WP22,WP5,WP9,WP91,16MnR, Cr5Mo, 12Cr1MoV, 10CrMo910,15CrMo, 12Cr2Mo1, ect)

Technology

Butt-welding,Seamless

Connection

But welded, socket welded, threaded

Surface


stainless steel: Polishing, Sand-blasting


carbon steel/alloy steel:

Black painting,varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,etc

Application

Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc

Package

Plastic film, wooden cases ,wooden pallet, or according to customers' request

Certificate

API, and ISO9001:2000 Certificates,CE,BV, etc.

Capacity

50000tons/year

Advantages

1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4. Reliable forwarder

Port of loading

Xingang (Tianjin) port

Payment Terms

30% down payment, the balance 70% T/T before the shipment Or L/C at sight.

Delivery Time

7-30 days, according to the order quantity.


elbow


elbow

elbow

elbow

elbow

elbow

elbow

elbow

elbow

Product Categories : Pipe Fittings > Elbow Fittings

Product Images

  • Alloy Butt weld pipe fitting elbows A234 WP11
  • Alloy Butt weld pipe fitting elbows A234 WP11
  • Alloy Butt weld pipe fitting elbows A234 WP11
  • Alloy Butt weld pipe fitting elbows A234 WP11
  • Alloy Butt weld pipe fitting elbows A234 WP11
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters